Project outputs / Available

Deliverable No.

Deliverable Name

Delivery Date

D1

Blocking Filter to enable multimaster deployments. Overview of documents

Report on channel measurements + Technical specifications + Conceptual design

Design and development of blocking Filters

Installation Manual and Application Notes for Blocking Filters

May 2008

D2

Programmable Band Pass Filter

August 2007

D3

Meter couplers/methods for Automatic Meter Reading (AMR) PLC applications. Overview

Channel Measurements and Analysis of the Insertion Loss

Technical specifications, design and development and user manual of meter couplers/ methods

May 2008

D4

Development and implementation of an Active Multipoint PLC signal splitter

May 2008

D5

Bare Overhead Line Couplers in order to minimize Installation Cost and EMC-Emission. Overview - Documents

Technical specification of bare Overheadline Couplers for PLCApplication

Design and development of the low voltage bare Overheadline Coupler MIC

Design and development of bar Overheadline Couplers for MV- PLC Application (MVIC)

Design and development of the low voltage bare Overheadline Coupler EMICC

Installation and application notes for the low voltage bare Overheadline Coupler MIC

Installation and application notes for the MVIC

Installation and application notes for the low voltage bare Overheadline Coupler EMICC

EMC- and Performance-Measurements for the New Developed Coupler

May 2008

D6

Optimized Design of existing MV/LV Couplers/Methods in order to minimize Installation Costs and EMC RADIATION

PLC coupler installation guide for an MV combined coupler and and active coupler

February 2007

D7

The Channel emulator. Overview - Documents

Technical specification of Channel emulator

Design and implementation of channel emulator

Test report of the Channel emulator

Application Note for the Channel emulator

June 2008

D8

EMC Measurement Report on Efficiency of EMC Mitigation Mechanisms

August 2007

D9

EMC Guidelines

November 2008

D10

Development and implementation of a PLC channel tester. Overview

Market and Technical Requirements specification of the PLC channel Tester

Technical Design of the PLC channel Tester

User manual for the PLC channel tester

February 2007

D11

Reference guide on the description of field trials and test procedures_M3 version

Reference guide on the description of field trials and test procedures_M6 version

Reference guide on the description of field trials and test procedures_M15 version

June 2007

D12

Preliminary results of the performed tests

March 2007

D13

Reference Guide on the Design of an Integrated PLC Network, Including the adaptations to allow the Carriers' Carrier model

October 2007

D14

PLC Field Trials. Deployment and Installation Issues

October 2007

D15

Results of the performed Tests - Definitive version

December 2008

D16

Report on evaluation of the test, conclusion and recommendation on the PLC network design and integration

December 2008

D18

First Set of PLC Prototypes to be Tested in the Field Trials

December 2007

D19

Second set of PLC Prototypes to be Tested in the Field Trials

December 2008

D20

Requirements on OPERA for Implementation of Multipurpose PLC networks including EMS

October 2007

D21

Report on implementation of EMS over OPERA

March 2008

D22

Interim report on the Implementation MAC-Level OPERA PLC Network Simulator

Report on the Implementation MAC-Level OPERA PLC Network Simulator

December 2007

May 2008

D23

Services Test Specification

October 2007

D24

Document of conclusions about the different serrvices tested over the new generation PLC network (M24 definitive version)

December 2008

D25

Whitepaper: Electricity Management Systems

September 2007

D27

First draft of OPERA specification version 2

June 2007

D30

First Report on the status of PLC standardization activities in CISPR

February 2008

D31

Second Report on the status of PLC standardization activities in CISPR

December 2008

D33

New Business Models and Technical Feasibility with WI-FI, WIMAX, UWB, ZIGBEE AND BLUETOOTH

December 2007

D37

Worldwide Market Research Report

December 2007

D38

Webpage: Permanent updates and maintennance

March 2007

D39

Newsletters

December 2008

D40

Report on the results of phase 2

December 2008

D41

Participation in selected fairs

December 2008

D42

Portable show room

December 2008

D43

Visits of installations

December 2008

D44

Participation in conferences

December 2008

D45

Report on raising public participation and awareness

Annex I

Annex II

Annex II

December 2008

D46

Workshops for public authorities

December 2008

D47

Workshops and exhibitions

December 2008

D48

Training Programs

December 2008

D49

Press Releases

December 2008

D50

Brochures and posters

Brochure

Poster1_PLC for Power Utilities

Poster2_PLC in the view of Endusers

March 2007

D51

White paper: OPERA technology (final version)

December 2008

D52

White paper: Comparison of Access Technologies (Definitive version)

December 2008

D53

Report on the Gender Action Plan

December 2008

D54

Final plan for using and disseminating knowledge

December 2008

D55

IPR guideline

AnnexI_Legal Protection

December 2008

D56

Project Presentation

January 2007